The Elevator Process Reimagined: How the Resolute Modular Elevator System Gives Projects More Control
The Elevator Process Reimagined – Construction projects succeed when schedules are predictable, coordination is streamlined, and risks are minimized. Unfortunately, traditional elevator installations are often among the most complex and schedule-sensitive portions of a project. Multiple trades, field-built shaft construction, lengthy installation periods, and last-minute coordination challenges can all create delays and increase costs.
The Resolute Modular Elevator System takes a different approach. By shifting much of the elevator scope from the jobsite to a controlled manufacturing environment, Resolute helps project teams gain greater control from initial design through final turnover. The result is a faster, more coordinated process that supports earlier occupancy, reduced jobsite exposure, and improved project outcomes.
Phase 1: Plan and Coordinate with Confidence
Every successful project starts with careful planning. The Resolute process begins with an early design and project review that evaluates application requirements, travel distance, number of stops, code considerations, hoistway location, pit conditions, and schedule objectives.
This early engagement allows the project team to leverage pre-engineered modular elevator designs and explore options long before construction begins. By clarifying scope early, owners and contractors gain better budget certainty and reduce the potential for costly changes later in the project.
Engineering coordination is also simplified through the use of project-specific submittals, detailed drawings, and Revit/BIM models. Architects, engineers, and contractors can integrate the elevator system into the overall building design with greater confidence, reducing conflicts and improving communication across all stakeholders.
Phase 2: Build Off-Site While the Site Advances
One of the greatest advantages of the Resolute Modular Elevator System is that elevator production occurs while site construction continues.
Instead of waiting for a shaft to be completed before beginning elevator work, the modular hoistway structure, entrance assemblies, guide rails, cab equipment, wiring, pit equipment, lighting, and related components are assembled in a factory-controlled environment. This parallel workflow can significantly shorten overall project schedules.
Factory production also improves quality control. Every system undergoes inspection, assembly verification, and pre-testing before delivery. Potential issues are identified and addressed before the elevator reaches the jobsite, helping reduce punch-list items and field adjustments.
Meanwhile, project teams can focus on preparing the site. Pit readiness, crane access, staging areas, power requirements, and building interface points can all be coordinated in advance, creating a smoother installation experience when delivery day arrives.
Phase 3: Set, Connect, and Turn Over
When the project is ready, the modular elevator tower is delivered to the site and set into place—often in a single crane operation. What traditionally required extensive field assembly is now largely complete.
Once set, crews complete final connections for power, fire alarm integration, phone and data systems, monitoring equipment, and flooring coordination. Because so much of the work has already been completed in the factory, the remaining on-site activities are streamlined and highly predictable.
Commissioning, testing, and inspection are then completed, often within a remarkably short timeframe compared to traditional elevator installations. This accelerated path helps projects achieve Certificates of Occupancy sooner, allowing owners to begin leasing space, serving occupants, or generating revenue earlier.
Elevator Process Reimagined – Benefits for Every Stakeholder
The Resolute process is designed to create value across the entire project team.
Developers and Owners
- Earlier occupancy opportunities
- Faster revenue generation
- Reduced schedule-related risk
- Improved long-term ownership value
General Contractors
- Less trade coordination
- Reduced site complexity
- Improved schedule certainty
- Fewer field disruptions
Superintendents
- Lower manpower requirements
- Reduced jobsite exposure
- Fewer installation variables
- Simpler project oversight
Architects and Engineers
- Easier integration through Revit/BIM models
- Pre-engineered design clarity
- Simplified coordination with building systems
- Reduced design conflicts
Project Managers
- Better scope definition
- Improved scheduling predictability
- Reduced change-order exposure
- Greater overall project control
The Key Advantage: Parallel Construction
Elevator Process Reimagined – The true power of the Resolute Modular Elevator System lies in its ability to shift major elevator scope off-site and allow manufacturing to occur simultaneously with building construction.
Rather than treating the elevator as a late-stage construction activity, Resolute transforms it into a parallel process. This approach reduces field duration, minimizes coordination challenges, lowers risk, and accelerates project completion.
In today’s construction environment, speed, predictability, and efficiency matter more than ever. The Resolute Modular Elevator System delivers all three by providing a fully installed and tested modular elevator solution that supports faster occupancy, earlier revenue, and greater confidence from design through turnover.
When project success depends on schedule control and predictable execution, the Resolute Modular Elevator System offers a smarter way forward.